Proven tech.
Decades of field data. Predictable production, predictable lifespan, predictable payback.
Lower entry cost.
Rack-mounted panels are the most cost-effective way to offset Florida's summer electric bills.
Hurricane-rated install.
Attachments and rails engineered to Florida wind code, installed by a Florida Certified Roofing & Electrical Contractor.
Best for
- ✓Existing roofs in good condition
- ✓Lowest upfront cost path to solar
- ✓Fast installation (1 to 3 days)
- ✓Homes where Solar Roof isn't a fit
Things to know
- ·Visible panels on the roof
- ·Roof must be in good condition first
- ·Panels must be temporarily removed for a future re-roof
- ·May affect some existing roof warranties
Our process
How we install.
1
Usage review
We pull 12 months of bills and size the system to real consumption.
2
Site assessment
Roof age, orientation, shading, and structural capacity checked.
3
Design & permits
System design, electrical plan, permit package, utility interconnection.
4
Install
1 to 3 day install with Florida Building Code attachments and wiring.
5
Commissioning
Utility sign-off, monitoring setup, you start generating.
Right-sized for your usage.
We design around your actual consumption, not a sales quota.
Contact